Needs ☐, Commits ➤, and Haves ✓ for:
PHASE 1 Site Selection - PHASE 4 Commence Day-to-day Operations

Send us an email with anything you might provide.

Materials/Services Needed for PHASE 1 - PHASE 4 Goals

Land and Compound

  • 100+ acres in North Georgia or Southern North Carolina, bordered by US Forest Service acreage. Why 100+ acres?

  • Tranquility Base USA is an organization which will provide ongoing and increasing targeted PTSD/MI Nature-Based Therapy (NBT) for Veterans, First Responders, and Healthcare workers in a natural setting. Bordering US Forest Service land ensures that the adjacent property development will never occur and disrupt the tranquil environment. Over 100 acres will allow controlled (organic architecture) growth without crowding the property.

Building and Construction Materials

  • Lumber for the construction of buildings in the Tranquility Base USA compound. How much is needed?

  • The exact amount of board feet and types of lumber are awaiting the completion of the building designs.
  • Metal roofing for the construction of buildings in the Tranquility Base USA compound. How much is needed?

    The exact number of squares needed are awaiting the completion of the building designs.
  • Water and soil pipe. How much, and what types are needed?

    The exact number of feet of copper water pipe, PVC drain/soil pipe types and lengths are awaiting the completion of the building designs.
  • Exterior windows and doors. What sizes and types are needed?

    The exact number of windows, doors, and various sizes needed are awaiting the completion of the building designs.
  • Electrical wiring, outlets, and switch devices. What wires sizes, outlet and switch device types are needed?

    The wire types, lengths, outlets and switch devices needed are awaiting the completion of the building designs.

Cabin/Lodge Interior

  • Appliances. What is needed?

    • 5 - On demand propane water heaters
    • 3 - Over/under washer/dryer units (propane fired dryer)
    • 3 - Refrigerators
    • 3 - Dishwashers
    • 2 - Propane oven/range (Standard)
    • 1 - Propane oven/ranges (Enhanced ADA lowering)
    • 2 - Microwave ovens (Standard)
    • 1 - Microwave oven (Enhanced ADA lowering)
    • H/V/A/C systems - exact size and count awaiting building design completion phase
  • Mattresses/box springs. What is needed?

    • 4 - Queen size mattresses (60"W x 80"L)
    • 4 - Queen size box springs (60"W x 80"L)
    • 4 - Full size mattresses (54"W x 75"L)
    • 4 - full size box springs (54"W x 75"L)
    • 8 - bed rail/frames
  • Linens. What is needed?

    • 10 - Queen size sheet sets (60"W X 80"L)
    • 20 - Queen size blankets (90"-100"W X 90"L)
    • 10 - Full/Double size sheet sets (54"W X 75"L)
    • 20 - Full/Double blankets (90"W X 80"L)
    • 40 - Bath towels (31"W X 57"L)
    • 60 - Hand towels (14"W X 33"L)
    • 60 - Face towel/wash cloth (14"W X 14"L)
  • Dishes, cups and saucers, and mugs, commercial grade. What is needed?

    • 80 - Dinner plates (9" - 11")
    • 80 - Breakfast/Lunch plates (8" - 10")
    • 80 - Salad plates (7" - 8")
    • 80 - Bread plates (6" - 7")
    • 60 - Cup/saucer sets
    • 70 - Coffee mugs
  • Flatware and utensils. What is needed?

    • 90 - Dinner/Steak knives
    • 90 - "Butter" knives
    • 90 - Dinner forks
    • 90 - Salad/dessert forks
    • 90 - Soup spoons
    • 90 - Dinner/tea spoons
    •  6 - Cutlery sets
    •  6 - Spatulas, cooking tongs, and whisks
  • Interior doors. What sizes and types are needed?

    The exact number of interior doors, and various sizes needed are awaiting the completion of the building designs.

Landscape and Grounds Materials

  • 12 - 20' aluminum flag poles. Why so many?

    Flags represent a significant component of identity to Veterans, First Responders, and Healthcare workers in linking to the ideals committed to by oath. The main lodge will fly the Flag of the USA, the five service branches, the three groups of, First Responders (Police, Firefighters, EMTs) and Healthcare. Each guest cabin will fly the Flag of the USA and the flag of the group the guest is affiliated with, to make it their "base" during their stay.
  • Flags What is needed?

    • 3 - USA Flag
    • 3 - US Army
    • 3 - US Marine Corps
    • 3 - US Navy
    • 3 - US Air Force
    • 3 - US Coast Guard
    • 3 - Police
    • 3 - Firefighter
    • 3 - EMT
    • 3 - Heathcare (Red Cross)
  • Grounds maintenance equipment. What is needed?

    • 1 - General purpose USED tractor bush-hog mower
    • 1 - large USED area mower
    • 1 - Medium sized USED pickup
    • 1 - USED tiller
    • Various tools and farm implements, trimmers and saws
  • Patio (outdoor) furniture. What is needed?

    • 4 - seven piece patio dining set, 1-(40"W X 40"L) table, 2-arm chairs, 4-chairs
    • 4 - five piece patio dining set to accommodate umbrella, 1-(40"W X 40"L) table, 4-arm chairs
    • 4 - 11' patio umbrellas

Materials/Services Which Have Been Committed for PHASE 1 - PHASE 4 Goals

Building and Construction Materials

  • Designs layouts and blueprints for all compound buildings

Materials/Services Received for PHASE 1 - PHASE 4 Goals

Cabin/Lodge Interior

  • Appliances. What has been received?

    • 1 - Bunn RL35 Bunn-O-Matic commercial coffee brewing machine with 5 warmers (20 Amps @ 240 Volts - [4,585 Watts])
    • 1 - Bunn TB30 Ice Tea commercial brewing machine with three 5.5 gallon stainless steel dispensing tanks (14 Amps @ 120 Volts - [1,680 Watts]
    • 1 - Manitowoc ice machine - under counter cuber
  • Glasses and dishes. What has been received?

    • 36 - Coca-Cola glasses, various colors

Landscape and Grounds Materials

  • Multiple sets of landscape/garden lights and power supplies. Why are these needed?

    The main lodge and guest cabins will have tranquil gardens for quiet reflection during the day. Nighttime offers a different dimension of contemplation and landscape lighting can significantly enhance the experience.
  • 2 - 20' aluminum flag poles. Why are more needed?

    Flags represent a significant component of identity to Veterans, First Responders, and Healthcare workers in linking to the ideals committed to by oath. The main lodge will fly the Flag of the USA, the five service branches, the three groups of, First Responders (Police, Firefighters, EMTs) and Healthcare. Each guest cabin will fly the Flag of the USA and the flag of the group the guest is affiliated with, to make it their "base" during their stay.
  • Grounds maintenance equipment. What has been received?

    • 1 - Snapper RER (Rear Engine Rider) 28" cut rotary mower.
    • 1 - Honda walk-behind self propelled rotary mower.
    • 3 - Trucut HR20, 20" walk-behind self propelled power reel mowers. (one needs repairs)
  • Webcams and NVR(Network Video Recorder) Why is this needed/what has been received?

    Webcams and NVR(Network Video Recorder) to provide 7/24 live stream video as construction progresses.
    • 3 - Foscam HT2 1080p Outdoor 2.4g/5gHz WiFi PTZ IP camera 4X optical Zoom Pan Tilt IP Cam.
    • 1 - Foscam 5MP 1080P HD 8 channel POE NVR recorder, 1TB HDD capacity.
    • 300 feet CAT5 cable

Needs ☐, Commits ➤, and Haves ✓ for:
PHASE 5 - Develop Small Working Farm

Send us an email with anything you might provide.

Materials/Services Needed for PHASE 5 Goals

Building and Construction Materials

  • Lumber for the barn construction and pasture fencing. What is needed?

  • The exact amount of board feet and types of lumber are awaiting the completion of the barn and fencing designs.
  • Metal roofing for the barn. How much is needed?

    The exact number of squares needed are awaiting the completion of the building designs.
  • Water and soil pipe. How much, and what types are needed?

    The exact number of feet of copper water pipe, PVC drain/soil pipe types and lengths are awaiting the completion of the building designs.
  • Exterior windows and doors. What sizes and types are needed?

    The exact number of windows, doors, and various sizes needed are awaiting the completion of the building designs.
  • Electrical wiring, outlets, and switch devices. What wires sizes, outlet and switch device types are needed?

    The wire types, lengths, outlets and switch devices needed are awaiting the completion of the building designs.

Landscape and Grounds Materials

  • Grounds maintenance equipment. What is needed?

    • 1 - USED farm tractor
    • 1 - USED plow disc attachment
    • 1 - USED front-end blade
    • 1 - USED general purpose flatbed trailer (7' X 12'-14')
    • Various tools and farm implements, trimmers and saws

Animals and seed

Materials/Services Which Have Been Committed for PHASE 5 Goals

Building and Construction Materials

  • Nothing at this time

Materials/Services Received for PHASE 5 Goals

Landscape and Grounds Materials

  • Nothing at this time

Needs ☐, Commits ➤, and Haves ✓ for:
PHASE 6 - Additional Cabin Construction

Send us an email with anything you might provide.

Materials/Services Needed for PHASE 6 Goals

Building and Construction Materials

  • Lumber for the construction of additional cabins. How much is needed?

  • The exact amount of board feet and types of lumber are awaiting the completion of the building designs.
  • Metal roofing for the construction of additional cabins. How much is needed?

    The exact number of squares needed are awaiting the completion of the building designs.
  • Water and soil pipe. How much, and what types are needed?

    The exact number of feet of copper water pipe, PVC drain/soil pipe types and lengths are awaiting the completion of the building designs.
  • Exterior windows and doors. What sizes and types are needed?

    The exact number of windows, doors, and various sizes needed are awaiting the completion of the building designs.
  • Electrical wiring, outlets, and switch devices. What wires sizes, outlet and switch device types are needed?

    The wire types, lengths, outlets and switch devices needed are awaiting the completion of the building designs.

Additional Cabin Interior

  • Appliances. What is needed?

    • 8 - On demand propane water heaters
    • 8 - Over/under washer/dryer units (propane fired dryer)
    • 8 - Refrigerators
    • 8 - Dishwashers
    • 6 - Propane oven/range (Standard)
    • 2 - Propane oven/ranges (Enhanced ADA lowering)
    • 6 - Microwave ovens (Standard)
    • 2 - Microwave oven (Enhanced ADA lowering)
    • 8 - H/V/A/C systems - exact size and count awaiting building design completion phase
  • Mattresses/box springs. What is needed?

    • 8 - Queen size mattresses (60"W x 80"L)
    • 8 - Queen size box springs (60"W x 80"L)
    • 8 - Full size mattresses (54"W x 75"L)
    • 8 - full size box springs (54"W x 75"L)
    • 16 - bed rail/frames
  • Linens. What is needed?

    • 16 - Queen size sheet sets (60"W X 80"L)
    • 32 - Queen size blankets (90"-100"W X 90"L)
    • 16 - Full/Double size sheet sets (54"W X 75"L)
    • 32 - Full/Double blankets (90"W X 80"L)
    • 64 - Bath towels (31"W X 57"L)
    • 64 - Hand towels (14"W X 33"L)
    • 64 - Face towel/wash cloth (14"W X 14"L)
  • Dishes, cups and saucers, and mugs, commercial grade. What is needed?

    • 80 - Dinner plates (9" - 11")
    • 80 - Breakfast/Lunch plates (8" - 10")
    • 80 - Salad plates (7" - 8")
    • 80 - Bread plates (6" - 7")
    • 60 - Cup/saucer sets
    • 70 - Coffee mugs
  • Flatware and utensils. What is needed?

    • 90 - Dinner/Steak knives
    • 90 - "Butter" knives
    • 90 - Dinner forks
    • 90 - Salad/dessert forks
    • 90 - Soup spoons
    • 90 - Dinner/tea spoons
    •  6 - Cutlery sets
    •  6 - Spatulas, cooking tongs, and whisks
  • Interior doors. What sizes and types are needed?

    The exact number of interior doors, and various sizes needed are awaiting the completion of the building designs.

Additional Cabin Landscape and Grounds Materials

  • 16 - 20' aluminum flag poles. Why so many?

    Flags represent a significant component of identity to Veterans, First Responders, and Healthcare workers in linking to the ideals committed to by oath. The main lodge will fly the Flag of the USA, the five service branches, the three groups of, First Responders (Police, Firefighters, EMTs) and Healthcare. Each guest cabin will fly the Flag of the USA and the flag of the group the guest is affiliated with, to make it their "base" during their stay.
  • Flags What is needed?

    • 8 - USA Flag
    • 8 - US Army
    • 8 - US Marine Corps
    • 8 - US Navy
    • 8 - US Air Force
    • 8 - US Coast Guard
    • 8 - Police
    • 8 - Firefighter
    • 8 - EMT
    • 8 - Heathcare (Red Cross)
  • Patio (outdoor) furniture. What is needed?

    • 8 - seven piece patio dining set, 1-(40"W X 40"L) table, 2-arm chairs, 4-chairs
    • 8 - five piece patio dining set to accommodate umbrella, 1-(40"W X 40"L) table, 4-arm chairs
    • 4 - 11' patio umbrellas

Materials/Services Which Have Been Committed for PHASE 6 Goals

Building and Construction Materials

  • Nothing at this time

Materials/Services Received for PHASE 6 Goals

Landscape and Grounds Materials

  • Nothing at this time

Needs ☐, Commits ➤, and Haves ✓ for:
PHASE 7 - Develop "Trails of Honor"

Send us an email with anything you might provide.

Materials/Services Needed for PHASE 7 Goals

Trail Construction Materials

  • Cement for tile castings. What is needed?

  • The exact amount of cement and colors remains to be determined

Landscape and Grounds Materials

  • Sod and plants. What is needed?

    • Zoysia sod for open areas lining the paved trails
    • Gravel for tiled trail borders
    • Brick pavers for borders

Materials/Services Which Have Been Committed for PHASE 7 Goals

Building and Construction Materials

  • Nothing at this time

Materials/Services Received for PHASE 7 Goals

Landscape and Grounds Materials

  • Nothing at this time